Lufthansa Technik – Sofia
Phase 2 ‐ To Construct a new 2 Bay Extension to Existing Facility Sofia Airport, Bulgaria Design & Project Management Phase 2 Completed ‐ March 2012
Phase 2 ‐ To Construct a new 2 Bay Extension to Existing Facility Sofia Airport, Bulgaria Design & Project Management Phase 2 Completed ‐ March 2012
In December 2007, Ryanair requested that we prepare a set of Employers Requirements for a 3 bay facilitie, with simulator, stores, workshops, offices and amenities. The project was tendered and Kier construction won the tender. The work on site commenced in March 2008 and was completed on 28th October 2008 ( same day as LTSF…
In 2009, Ryanair made a decision to provide Line maintenance facilities at Kaunas and Rygge. These facilities were to be constructed as cost effectively as possible on existing apron / adjoining existing apron / new apron, as the Airport decided. A brief was prepared for a structural steel solution and a fabric tent. These were tendered…
Ryanair required that a brief was prepared for a 2 bay facility in Hahn for line maintenance. We prepared this brief for Hahn Airport, who then had the building designed and constructed by an investor who now owns the hangar, but leases it back. The building is 3000 m2 and can accommodate 2 aircraft for…
In May 2011, we were contacted by Birmingham Airport with a request; could we design and construct a hangar by December 2011? The scope of the project was to be a 2,400m2 facility for executive jets. In conjunction with Birmingham airport and their client Eurojet, we prepared a set of Employers Requirements for an 2,600m2…
As part of an expansion of Lufthansa Technik, they decided to build a five bay facility in Aguadilla, Puerto Rico. In October 2013 we visited Puerto Rico with the LHT team. In conjunction with the team, we prepared the concept layouts for the project, which were tendered in January 2014 using the Design Build model….
MAAS Aviation have further developed their relationship with Airbus. In 2014 MRO Facilities International assisted them to win the bid to provide a single aisle paint shop as part of the Airbus US FAL ( Final Assemble line) in Mobile, Alabama. The construction started in March 2014, and was completed by the end of June…